Aluminum Alloy Profile
1.Specification: Various size as customer's requirements
OD
OD Tolerance
ID Tolerance
Roundness
straightness
Circular run-out
φ16-20
±0.02
±0.02
0.01↓
0.015↓
0.05↓
φ20-30
±0.02
±0.02
0.01↓
0.015↓
0.05↓
φ30-50
±0.05
±0.05
0.02↓
0.020↓
0.08↓
φ50-80
±0.15
±0.10
0.05↓
0.025↓
0.10↓
7. OPTIONAL PACKING: Polyfoam interleave inside, wooden case
Trade Terms
Aluminum Alloy Profile,Aluminium Anodized Profile,Aluminum Anodized Profile,Aluminium Profile Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com
This standard was proposed by the National Standardization Technical Committee for Electronic Services, and was approved by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China. It was formally included in the National Standard System Revision Project in 2009. It has undergone four years of preparation and publication, and has undergone repeated and repeated experts' argumentation and revision. reply.
This standard mainly stipulates the basic content of urban traffic flow information collection requirements and information storage format, and is applicable to the collection, storage, and database design of traffic flow information of motor vehicles in urban transportation. The formulation of standards is conducive to the standardization of urban traffic information in the later period, and makes the handling and dissemination of traffic flow information more standardized and organized. This will help improve the overall level of intelligent traffic information technology and promote the development of real-time traffic information services in cities. It further established the leading position in the smart transportation field of Yinjiang.
2.Material:A6063,A6061,A3003 and other series alu alloy
3.Suface treatment: anodizing ,polishing,turning ,power coating,mill finish etc
4.Design:OEM,ODM,or design by ourselves
5.Equipment: CNC ,extruding machine,cold drawn machine,heating oven,straigtening machine,cutting machine
6. STANDARD PACKING :Wooden case/carton
1. Payment: 30% T/T in advance, 70% balance pay before delivery. L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai
"National Urban Traffic Flow Information Collection and Storage" released
According to the China National Standard No. 41 Announcement in 2012, the Urban Traffic Flow Information Collection and Storage Reported by the Traffic Police Detachment of Hangzhou Public Security Bureau, Yinjiang Co., Ltd., Zhejiang University of Technology, and China National Institute of Standardization as the main drafting unit. The national standard was approved for publication, and the standard number was "GB/T 29192-2012". The implementation date of the standard was June 1, 2013.