Mine quality accident handling regulations

In accordance with the provisions of the "Construction Engineering Quality Management Regulations") (State Council Order No. 279), if a construction project has a quality accident, the relevant unit shall report to the local construction administrative department and other relevant departments within 24 hours. For major quality accidents, the construction administrative department and other relevant departments of the accident place shall report to the local people's government and the higher-level construction administrative department and other relevant departments according to the type and level of the accident. The investigation procedures for special major quality accidents shall be handled in accordance with the relevant provisions of the State Council. In the event of a major project quality accident concealing, reporting, or delaying the reporting period, the directly responsible person in charge and other responsible personnel shall be given administrative sanctions according to law.
After the occurrence of a quality accident, the accident-generating unit and the construction administrative department of the accident site shall strictly protect the accident site and take effective measures to prevent the accident from expanding.
After a quality accident occurs, investigation and analysis should be conducted to find out the reasons and learn lessons. The basic steps and requirements for the analysis are:
1. Through detailed investigations, identify the occurrence of the accident and analyze the causes of the accident, such as people, machinery, materials, methods and processes, and the environment. After careful, objective, comprehensive, detailed and accurate analysis to determine the nature
and responsibility for the accident.
2. When analyzing the cause of the accident, it should be gradually extended from the direct cause to the indirect cause according to the facts confirmed by the investigation.
3. Determine the nature of the incident. The nature of accidents is usually divided into liability accidents and non-responsible accidents.
4. According to the cause of the accident, clear specific measures to prevent similar accidents, and set the person, time, and standards to complete the entire content of the measures.

Double Layer Roll Forming Machine

The double layer roll forming machine can produce two different profile drawings on one machine, saving more space and more money when compared with using two different machines. The double layer panel roll forming machine can produce one layer profile at a time. There is one clutch on the side of the machine and we just need to move one handle wheel to roll form the other layer profile.

It can manufacture corrugated and trapezoid double layer, corrugated and glazed tile double layer, trapezoid and glazed tile double layer.


Specifications:

Raw material Color coated steel, Galvaznized steel, Aluminum steel
Material thickness range 0.3-1mm
Rolles 11-18 rows(according to drawings)
Material of rollers 45# steel with chromed
Forming speed 25-30m/min
Shaft material and diameter 75mm, material is 40Cr
Main motor power 5.5KW-7.5KW
Hydraulic station power 5.5KW
Material of cutting blade Cr12 mould steel with quenched treatment
Uncoiler's loading capacity Max. Capacity
5tons(can be increased to be 10 tons)
Controlling system Mitsubishi PLC & converter
Voltage 380V/3Phase/50Hz(or at buyer's requirements)

Working process:


Hydraulic decoiler - Material guiding - Support stocker - Main roll forming machine - PLC control system - Hydraulic cutting - Run-out table


Pictures:

Double layer roof sheet roll forming machine

Double layer roll forming machine

Double layer roll forming machine

Double layer roof sheet roll forming machine

Double layer roof sheet roll forming machine

Double layer roof sheet roll forming machine

Double layer roof sheet roll forming machine

Double layer roof sheet roll forming machine

Double layer roof sheet roll forming machine

Double layer roof sheet roll forming machine



Training and Installation :
1. We offer installation service local in paid, reasonable charge.
2. QT test is welcome and professional.
3. manual and using guide is optional if no visiting and no installation.


Certification and after service:

1. Match the technology standard, ISO producing certification
2. CE certification
3. 12 months warranty since the delivery. Board.


Our advantage:

1. Short delivery period.
2. Effective communication
3. Interface customized.

Double Layer Roll Forming Machine,Aluminum Double Layer Roll Forming Machine,Double Layer Metal Roof Roll Machine,Automatic Double Layer Roll Forming Machine

YingYee Machinery and Technology Service Co.,Ltd , https://www.yingyee.cn