Invested a huge capital of 500 million yuan to build the Western Auto Parts Center


On the 27th, the second project of the Western China Expo held centralized signing activities. Following the signing of 100 overseas and overseas investment projects on the first day of the opening ceremony, a number of investment contracts involving a total amount of 3.095 billion yuan were signed. Among them, an investment signed by Shanghai Yachuang Investment and Development Co., Ltd. and Chengdu Hi-tech Zone was 520 million yuan, and the project of building auto parts logistics center was the largest one in this contract. It is reported that the investment projects signed this time include five industrial projects involving an amount of 224 million yuan, four infrastructure projects involving an amount of 900 million yuan, two tourism projects involving an amount of 245 million yuan, and five real estate projects. The amount involved was 350 million yuan; 1 electronic information project involved 23 million yuan. In this contracting project, there are 8 projects worth 100 million yuan. The largest of these projects is Shanghai Yachuang Investment and Development Co., Ltd.'s investment in Chengdu Hi-tech Zone to build an auto parts distribution center. Before the signing ceremony, Ben Wang reporter interviewed Mr. Gao, the Shanghai contracting representative. He said that the investment in Chengdu was mainly due to the large amount of room for development in Chengdu's logistics and auto parts. He also invested a lot in “hardware”. It is hoped that through the cooperation of the two sides, Sichuan will bring more advanced logistics management experience from the coast. Become a leading auto parts base in the southwest region. He told reporters that he is very satisfied with the overall investment environment in Chengdu. “The efficiency of the work here is high, the overall hardware environment is good, and infrastructure construction can keep up.” Source: Sichuan News

Manual Coal Steam Boiler

Manual Coal Steam Boiler Features

1.The boiler has big drum and have big enough space for water. Compared with the SZL series, the DZL boiler is more adaptable to poor water quality. Moreover , when the boiler scaled, it is convenient for maintenance.

2. Adopting convex tube plate, prevent tube plate cracking and simplify the structure of canceling the tension bar.

3. The Wing-shape flue arrangement, the flue gas is three pass, reduce the smoke temperature of high temperature area tube plate, thereby preventing the cracking of tube plate and Boiler tube explosion.

4. Adopting threaded smoke-tube technology, strengthen heat transfer, reduce the number of pipes and the size of boiler shell; reduce the thermal stress at the end of the pipe, and prevent cracking of the tube plate. At the same time, due to the self-cleaning ability of the flue gas in the threaded pipe, avoid the accumulation of dust in the tube.

5. The boiler has sufficient output, fast speed heating and high thermal efficiency.

Manual Coal Boiler,Industrial Manual Coal Boiler,Manual Coal Fired Boiler,Manual Coal Fired Steam Boiler,Manual Type Coal Boiler

Henan Yuanda Boiler Co., Ltd. , https://www.industrialeconomi.com