The National Energy Administration issued the "Circular on Regulating the Requirements for Wind Power Development and Construction Management." It pointed out that some localities did not arbitrarily approve planned and planned new projects in accordance with national unified plans, leading to severe wind-blown phenomena in many local wind farms. The notice requires all localities to focus on clearing up unscheduled projects, and proposes that new wind power bases that will abandon winds by more than 20% will be strictly controlled in the future. According to relevant sources from the National Energy Administration, the National Energy Administration has officially issued a total of 16.76 million kilowatts of wind power planning projects in 2012. The distribution of new projects will focus on areas outside the “Three Norths†(northeast, north, north, and northwest). This means that the focus of future development of the wind power industry will gradually move out of the traditional large-scale wind power bases. In the future, wind power development in areas with low wind speed, such as Anhui, Hunan, Hubei, etc., represented by somewhat lower wind energy resources, will accelerate. Plate-frame Filter Press,Thallium Mine Filter Press,Cobalt Filter Press,Small Filter Press Chamber Filter Press, Filter Press Co., Ltd. , http://www.nbfilterpress.com