Cantilever Type Wire Rod Payoff Cantilever Type Wire Rod Payoff,Cantilever Pay Off Rack,Steel Wire Rod,Wire Rod Payoff Dovin limited , https://www.dovinmachine.com
Several installation methods of industrial-grade switches
What are the installation methods for DIN rail industrial switches?
The operation steps are divided into the following aspects:
1. Installation method of flat desktop
2. Installation method of upper rack
3. DIN rail installation method
4. Wall-mounted installation method
Method 1: Installation method of flat desktop
Shenzhen Tianbo Industrial Switches can be placed directly on a smooth, flat and safe desktop. Note: Don't put heavy objects on the top of the switch (≤4.5Kg), otherwise the switch will be damaged. Determine whether a suitable working environment (including power supply and network wiring) and enough space can be provided to ensure the ventilation and heat dissipation of the equipment; please pay attention to the following
Placement requirements:
(1) The physical surface on which the switch is placed must be able to bear a weight of more than 3kg
(2) Ensure that there is a space distance of 3-5cm around the switch, and no heavy objects can be placed on the switch
Method 2: Mounting on the rack
The chassis of Shenzhen Tianbo rack-mounted industrial switch is fixed on the rack through brackets. When leaving the factory
When two L-shaped chassis mounting ears have been installed, the operation method is as follows: Please pay attention to the following placement requirements:
(1) Shenzhen Tianbo rack-mounted industrial switches are all designed with standard 19-inch chassis, please use standard installation cabinets.
(2) On-site installation requires 4 screws, and the mounting ears of the chassis are designed with slot-shaped holes for easy size adjustment.
Method three. DIN rail installation
Shenzhen Tianbo rail-mounted industrial switch adopts 35mm standard DIN rail-mounted installation, which is very convenient in most industrial applications. The installation steps are as follows:
(1) Check whether you have rail installation tool accessories (installation accessories are provided for this product)
(2) Check whether the rail is firmly fixed and whether there is a suitable place for installing the product.
(3) Adjust the product to the correct installation direction, that is, the power supply terminal is upward. Method 4: Wall-mounted installation
The installation of Shenzhen Tianbo wall-mounted industrial switches is also very common in industrial field applications. The installation instructions are as follows:
(1) Use a screwdriver to remove all three screws. The screw at screw 1 depends on whether the installation space on site is enough to decide whether to remove them together. (It is recommended to reserve when there is enough space)
(2) Rotate the disassembled wall hanging ear by 180 degrees, align it with the screw hole, and fix it twice. Loose screws or slippage may cause fatal damage to the device. Please check whether the screws are in place.
(3) Fix it in the wall-hanging hole reserved on the wall-hanging ear.