In the 11907 contact lane, a fault was encountered during the excavation process, and the fault was produced at 177°∠41°. H = 2.2 m. In order to ensure the safe and smooth construction of the excavation during the fault, the following safety technical measures are specially formulated: Technical measures: Cross-fault construction method It is required to use a small cannon and a wind tunnel to dig a short branch and short excavation. It is required that each shot should not exceed 600 mm. Shed roof beam penetrated management using the management of the wedge, the wedge through the bolt waste materials, such as iron and Qianzi material. The lanes help the steel legs to prevent the inverted shed device. If there is an empty gang, the lanes must be filled and compacted, and the plastic woven nets and struts are used for support. If the roof area of ​​the roadway is more than 1 square meter, the anchor should be placed within the empty roof area (the spacing between the anchors is 800mm*800mm). Construction of ordinary drill and blast method, using pneumatic drill anchor head or YT-28 drills, electric detonators MS Delay positive charge, on-line in series, the explosive grade 3 coal mine permissible emulsion explosive, a roll of water cannons per eye Mud, the length of the mud is strictly in accordance with the regulations. The use of divided eye-catching, divided charge, detonation, the number of shots per time is no more than 10, the depth of the eye when the support is 800mm, the eye volume per eye does not exceed 0.2kg of explosives, the gutter The eye does not exceed 0.4kg and the auxiliary eye is between the two. The frame support cycle progress is 0.6m, the maximum control top distance is less than 0.8m, and the minimum control top distance is less than 0.2m. First, permanent support 1.19# Coal contact Shangshan roadway permanent support adopts anchor net beam support (special case adopts frame support), roadway net width × net height = 4.2 × 2.9m. The top is made of Ф20×2000mm high-strength anchors. Each anchor has 2 coils of resin anchoring agent. It is matched with Ф16×4000mm reinforced beams. The spacing between bolts is 800×800mm. It is matched with Ф15.24mm×6.3m anchor cable. Plate, 4 anchors of resin anchoring agent for each anchor cable, between anchor cables and rows, 1800mm×2000mm, arranged along the center of the roadway; the two roadway supports are strong anchors such as Ф20×2000mm, and each anchor is 2 rolls. Resin anchoring agent, the spacing between anchors is 800×800mm. Full roadway section laying Ф4.0mm, 50 × 50mm mesh woven metal mesh, stubble pressure of not less than 100mm, # 12 wire connection, connection spaced not more than 200mm. 2. When the roof crushing pressure is large or the top-supporting coal is constructed, when the strength of the anchoring mesh cable cable is not up to the design requirements, the trapezoidal steel shed is used, the shed is 600mm, and the backing plate is 400mm. Specifications: length × width × thickness =800mm×70mm×40mm, 6m×1.2m plastic mesh is laid in full section, the pressure is not less than 100mm, and it is connected by 14# wire, the connection spacing is less than or equal to 200mm. After the installation, each steel shed will play 4 struts, and the slab specifications: length × width × thickness = 580mm × 70mm × 70mm. Second, temporary support (1) Temporary support form 1. The construction process no matter good or bad stone slate roof, must adopt temporary support. The temporary support is supported by metal front beam. The front beam must use at least three intact Φ75mm seamless steel tubes with a length of 4.8m and a wall thickness of not less than 4.0mm. The back wood should be 1.6m long and the thickness should be no less than 50mm. Solid wood not less than 100mm; the lifting ring is bent into a circular diameter of Φ100mm by a steel plate with a thickness of 8mm, and the M20 nut is welded up. Each front beam must be suspended by two rings in a straight line (the line is parallel to the center line of the roadway). The spacing between the rings is the spacing of two adjacent rows of top anchors on a straight line. The maximum control top distance of the temporary beam temporary support is 1900mm, and the minimum control top distance is 300mm. It is strictly forbidden for personnel to work under the empty roof. Safety technical measures 1. Strictly implement the system of knocking and helping. Before starting work, the team leader must conduct a comprehensive inspection of the safety of the work surface and confirm that there is no danger before the authorized personnel enter the work surface. 2. Excavation work is strictly prohibited for empty top work. The support within 10m of the heading face must be reinforced before blasting. 3, must take the front to explore support. 5, to shallow eye, more eye, less charge, put a small cannon, or hand rubbing method, try to avoid shaking the surrounding rock or cause a roof due to shooting. Support in time to minimize the exposure time of the top plate and reduce the exposed area. If the pressure increases, special support should be taken in time for the site. 7. In the construction process, it is necessary to adhere to the principle of “discovery and exploration, first exploration and then excavationâ€. 8. The underground personnel must be familiar with the water inrush: the pressure of the two groups is significantly increased, the bottom drum or cracks occur, water is generated, the lanes are covered with sweat and red, the water is increased, the air is cold, the mist is generated, the water color is mixed, and the water is mixed. There is a smell in the hair, and there is a hole in the drill and there is a stuck phenomenon. If the above water inrush is present, the cause should be immediately identified and reported to the dispatching room. If the situation is urgent, the personnel should be evacuated according to the disaster avoidance route. 9. Strict implementation of operating procedures, handover classes and safety inspection systems during construction. It is necessary to constantly observe the changes in the stability of the surrounding rock, and timely grasp the time when the faults, fracture zones, and lithologic abrupt zones are exposed. Once you find an abnormality, you should deal with it in time to prevent it from happening. 10. If the roof of the shot is difficult to control and manage, and there is a danger of falling roof, it should be changed by hand. 11. The underground electrical equipment should be placed in a place where the ventilation conditions are better and there is no water around; 12. Underground electrical equipment, cables and wires shall not be repaired and repaired; 13. Strictly implement the system of power transmission and stoppage. Power failure must be listed, and electricity and discharge should be carried out before work. Blasting management 1. Eye-catching: When drilling the hole, do not swing the drill pipe up and down to ensure the direction of drilling. Do not stand under the drill pipe to avoid hurting people. 2. Charge: (1) Apply high-pressure water or compressed air to clean the blasthole before charging, and then place the bottom mud. (2) When you are charging, you should use a hand-drawn foot line and gently push the medicine roll into the fundus with a wooden or bamboo gun stick in one hand, and apply even force to make the medicine rolls meet. After the medicine is packaged, the ends of the two legs should be kinked. (3) The application of water cannon mud and non-combustible, plastic clay for sealing mud, it is forbidden to use block materials for sealing mud. It is strictly forbidden to shoot the blasthole without sealing mud, insufficient sealing mud or not strict. (4) When loading the cannon mud, pull the mud with one hand and use the gun stick in one hand, and gently tamper it. 3, shooting warning (1), the evacuation distance of the gun: the detonation position must be set outside the 11907 lane, and the straight line distance is guaranteed to be 300m, the straight bend distance is 150m, and there is shelter cover. The length of the blasting busbar should meet the blasting requirements. (2) When blasting, it is necessary to stand at all the channels that can reach the blasting site with a straight line of 300m and a straight bend of 150m. The team leader should assign responsible personnel to stand guard, and warning signs, railings or drawstrings should be set at the warning line. (3) Before the blasting, the team leader must check the personnel situation and determine that there is no one in the working face and the warning line before issuing the detonation order. The blaster used the whistle as a warning number, and at least three whistle blows each time, each time between 5 and 10 seconds, and no problem can be detonated. 4, shooting (1) Before the shooting, the cables, wind pipes and other equipment in the front and rear lanes of the shooting can be covered, and the tools are moved to the safe place behind the working surface. (2) The gunners, the inspectors, the team leader must implement the "one gun and three inspection system" and the "three-person chain shot" system. (3) The shooting work must be carried out by full-time gunners and certified to work. All blasting personnel, including blasting, drug delivery, and charging personnel, must be familiar with the performance of the blasting materials and the provisions of this regulation. (4), the connection of the blasting busbar and the footline, and the inspection and blasting work of the blasting line. Only the gunners are allowed to operate by one person, and other personnel are strictly prohibited from engaging in this work. (5), eye-catching and charging should not be carried out at the same time. It is strictly forbidden to put cannon and cannon. (6) In case of one of the following circumstances, the drug is not allowed to be released: 1. When the gas concentration in the return airflow reaches 0.8% within 20m near the shooting location. 2. Within 20m of the shooting position, there will be uncleared coal gangue, when the mine car or other objects block the 1/3 section of the roadway. 3. When the working surface control top distance exceeds the specified time. 4. There is gas in the blasthole, and the temperature is high and low. 5. When the working face is insufficient. 5. Blasting requirements: 1. All blasting personnel, including the blasting personnel and the drug delivery and charging personnel must be familiar with the basic performance and use requirements of the blasting equipment and blasting materials; 2, eye-catching, charging, shooting, according to the blasthole layout and blasting instructions; 3. After the explosives are collected, they should be placed in the explosives box and locked. The middle of the explosives must not be stopped or transferred to others. The remaining explosives on duty must be returned to the explosives warehouse on duty; the electric detonators are only allowed to be placed in the explosive materials box, and they are carried. Lock, do not allow random, in case of loss. 4. Explosives and detonators must be stored separately in a special explosive material box and locked; the explosive material box must be placed in a place where the top plate is intact, the bracket is intact, and the machinery and electrical equipment are avoided. The blasting material box must be placed in a safe place outside the warning line during blasting. The distance between the explosive material box and the detonator box is not less than 15m. 5. When extracting a single electric detonator from a bundle of electric detonators, do not pull the tube hard to smash the tube body, or pull the tube body hard to rub the foot line. The bundled electric detonator should be smoothed and the front end line should be pulled out. Pull the detonator out. After a single electric detonator is withdrawn, its foot line must be twisted into a short circuit. 6. When assembling the explosive charge, the following rules must be observed: A. It must be carried out near the blasting work site where the roof is well protected from electrical equipment and electrical conductors. It is strictly forbidden to sit on the blasting material box to assemble the explosive charge. B. Assembling the explosive charge should prevent the electric detonator from being subjected to vibration, impact, breaking the foot line and damaging the insulation of the foot line. C. The electric detonator must be installed at the top of the medicine roll. It is strictly forbidden to use electric detonators instead of bamboo and wooden sticks. The electric detonator must be fully inserted into the medicine roll. It is strictly forbidden to insert the electric detonator obliquely in the middle of the medicine roll or on the medicine roll. D. After the electric detonator is inserted into the medicine roll, the detonator must be entangled with the foot line, and the electric detonator line is twisted into a short circuit. 6. After blasting, after 30 minutes (at least 30 minutes), the guns are blown away. The gunners, tile inspectors and team leaders must first inspect the blasting site to check the ventilation and gas. Through fault safety technical measures In the 11907 contact lane, a fault was encountered during the excavation process, and the fault was produced at 177°∠41°. H = 2.2 m. In order to ensure the safe and smooth construction of the excavation during the fault, the following safety technical measures are specially formulated: Technical measures: Cross-fault construction method It is required to use a small cannon and a wind tunnel to dig a short branch and short excavation. It is required that each shot should not exceed 600 mm. The roof management is managed by the I-beam shed, which is used to break through the wedge. The wedge material is made of iron materials such as scrap bolts and brazing. The lanes help the steel legs to prevent the inverted shed device. If there is an empty gang, the lanes must be filled and compacted, and the plastic woven nets and struts are used for support. If the roof area of ​​the roadway is more than 1 square meter, the anchor should be placed within the empty roof area (the spacing between the anchors is 800mm*800mm). It is constructed by ordinary drilling and blasting method. The wind-driven anchor head or YT-28 wind drill is used for the eye. The millisecond delay electric detonator is charged in the forward direction, and the series is connected. The explosive used is a three-level coal mine permitting emulsion explosive, and each eye has a roll of water cannon mud. The length of the sealing mud is strictly in accordance with the regulations. The use of divided eye-catching, divided charge, detonation, the number of shots per time is no more than 10, the depth of the eye when the support is 800mm, the eye volume per eye does not exceed 0.2kg of explosives, the gutter The eye does not exceed 0.4kg and the auxiliary eye is between the two. The frame support cycle progress is 0.6m, the maximum control top distance is less than 0.8m, and the minimum control top distance is less than 0.2m. First, permanent support 1.19# Coal contact Shangshan roadway permanent support adopts anchor net beam support (special case adopts frame support), roadway net width × net height = 4.2 × 2.9m. The top is made of Ф20×2000mm high-strength anchors. Each anchor has 2 coils of resin anchoring agent. It is matched with Ф16×4000mm reinforced beams. The spacing between bolts is 800×800mm. It is matched with Ф15.24mm×6.3m anchor cable. Plate, 4 anchors of resin anchoring agent for each anchor cable, between anchor cables and rows, 1800mm×2000mm, arranged along the center of the roadway; the two roadway supports are strong anchors such as Ф20×2000mm, and each anchor is 2 rolls. Resin anchoring agent, the spacing between anchors is 800×800mm. The full section of the roadway is laid with a Ф4.0mm, meshed 50×50mm woven metal mesh, the compression is not less than 100mm, and connected by 12# wire, the connection spacing is not more than 200mm. 2. When the roof crushing pressure is large or the top-supporting coal is constructed, when the strength of the anchoring mesh cable cable is not up to the design requirements, the trapezoidal steel shed is used, the shed is 600mm, and the backing plate is 400mm. Specifications: length × width × thickness =800mm×70mm×40mm, 6m×1.2m plastic mesh is laid in full section, the pressure is not less than 100mm, and it is connected by 14# wire, the connection spacing is less than or equal to 200mm. After the installation, each steel shed will play 4 struts, and the slab specifications: length × width × thickness = 580mm × 70mm × 70mm. Second, temporary support (1) Temporary support form 1. During the construction process, no matter whether the roof rock is good or bad, temporary support must be used. The temporary support is supported by metal front beam. The front beam must use at least three intact Φ75mm seamless steel tubes with a length of 4.8m and a wall thickness of not less than 4.0mm. The back wood should be 1.6m long and the thickness should be no less than 50mm. Solid wood not less than 100mm; the lifting ring is bent into a circular diameter of Φ100mm by a steel plate with a thickness of 8mm, and the M20 nut is welded up. Each front beam must be suspended by two rings in a straight line (the line is parallel to the center line of the roadway). The spacing between the rings is the spacing of two adjacent rows of top anchors on a straight line. The maximum control top distance of the temporary beam temporary support is 1900mm, and the minimum control top distance is 300mm. It is strictly forbidden for personnel to work under the empty roof. Safety technical measures 1. Strictly implement the system of knocking and helping. Before starting work, the team leader must conduct a comprehensive inspection of the safety of the work surface and confirm that there is no danger before the authorized personnel enter the work surface. 2. Excavation work is strictly prohibited for empty top work. The support within 10m of the heading face must be reinforced before blasting. 3, must take the front to explore support. 5, to shallow eye, more eye, less charge, put a small cannon, or hand rubbing method, try to avoid shaking the surrounding rock or cause a roof due to shooting. Support in time to minimize the exposure time of the top plate and reduce the exposed area. If the pressure increases, special support should be taken in time for the site. 7. In the construction process, it is necessary to adhere to the principle of “discovery and exploration, first exploration and then excavationâ€. 8. The underground personnel must be familiar with the water inrush: the pressure of the two groups is significantly increased, the bottom drum or cracks occur, water is generated, the lanes are covered with sweat and red, the water is increased, the air is cold, the mist is generated, the water color is mixed, and the water is mixed. There is a smell in the hair, and there is a hole in the drill and there is a stuck phenomenon. If the above water inrush is present, the cause should be immediately identified and reported to the dispatching room. If the situation is urgent, the personnel should be evacuated according to the disaster avoidance route. 9. Strict implementation of operating procedures, handover classes and safety inspection systems during construction. It is necessary to constantly observe the changes in the stability of the surrounding rock, and timely grasp the time when the faults, fracture zones, and lithologic abrupt zones are exposed. Once you find an abnormality, you should deal with it in time to prevent it from happening. 10. If the roof of the shot is difficult to control and manage, and there is a danger of falling roof, it should be changed by hand. 11. The underground electrical equipment should be placed in a place where the ventilation conditions are better and there is no water around; 12. Underground electrical equipment, cables and wires shall not be repaired and repaired; 13. Strictly implement the system of power transmission and stoppage. Power failure must be listed, and electricity and discharge should be carried out before work. Blasting management 1. Eye-catching: When drilling the hole, do not swing the drill pipe up and down to ensure the direction of drilling. Do not stand under the drill pipe to avoid hurting people. 2. Charge: (1) Apply high-pressure water or compressed air to clean the blasthole before charging, and then place the bottom mud. (2) When you are charging, you should use a hand-drawn foot line and gently push the medicine roll into the fundus with a wooden or bamboo gun stick in one hand, and apply even force to make the medicine rolls meet. After the medicine is packaged, the ends of the two legs should be kinked. (3) The application of water cannon mud and non-combustible, plastic clay for sealing mud, it is forbidden to use block materials for sealing mud. It is strictly forbidden to shoot the blasthole without sealing mud, insufficient sealing mud or not strict. (4) When loading the cannon mud, pull the mud with one hand and use the gun stick in one hand, and gently tamper it. 3, shooting warning (1), the evacuation distance of the gun: the detonation position must be set outside the 11907 lane, and the straight line distance is guaranteed to be 300m, the straight bend distance is 150m, and there is shelter cover. The length of the blasting busbar should meet the blasting requirements. (2) When blasting, it is necessary to stand at all the channels that can reach the blasting site with a straight line of 300m and a straight bend of 150m. The team leader should assign responsible personnel to stand guard, and warning signs, railings or drawstrings should be set at the warning line. (3) Before the blasting, the team leader must check the personnel situation and determine that there is no one in the working face and the warning line before issuing the detonation order. The blaster used the whistle as a warning number, and at least three whistle blows each time, each time between 5 and 10 seconds, and no problem can be detonated. 4, shooting (1) Before the shooting, the cables, wind pipes and other equipment in the front and rear lanes of the shooting can be covered, and the tools are moved to the safe place behind the working surface. (2) The gunners, the inspectors, the team leader must implement the “one gun and three inspection system†and the “three-person chain shot†system. (3) The shooting work must be carried out by full-time gunners and certified to work. All blasting personnel, including blasting, drug delivery, and charging personnel, must be familiar with the performance of the blasting materials and the provisions of this regulation. (4), the connection of the blasting busbar and the footline, and the inspection and blasting work of the blasting line. Only the gunners are allowed to operate by one person, and other personnel are strictly prohibited from engaging in this work. (5), eye-catching and charging should not be carried out at the same time. It is strictly forbidden to put a cannon and a cannon. (6) In case of one of the following circumstances, the drug is not allowed to be released: 1. When the gas concentration in the return airflow reaches 0.8% within 20m near the shooting location. 2. Within 20m of the shooting position, there will be uncleared coal gangue, when the mine car or other objects block the 1/3 section of the roadway. 3. When the working surface control top distance exceeds the specified time. 4. There is gas in the blasthole, and the temperature is high and low. 5. When the working face is insufficient. 5. Blasting requirements: 1. All blasting personnel, including the blasting personnel and the drug delivery and charging personnel must be familiar with the basic performance and use requirements of the blasting equipment and blasting materials; 2, eye-catching, charging, shooting, according to the blasthole layout and blasting instructions; 3. After the explosives are collected, they should be placed in the explosives box and locked. The middle of the explosives must not be stopped or transferred to others. The remaining explosives on duty must be returned to the explosives warehouse on duty; the electric detonators are only allowed to be placed in the explosive materials box, and they are carried. Lock, do not allow random, in case of loss. 4. Explosives and detonators must be stored separately in a special explosive material box and locked; the explosive material box must be placed in a place where the top plate is intact, the bracket is intact, and the machinery and electrical equipment are avoided. The blasting material box must be placed in a safe place outside the warning line during blasting. The distance between the explosive material box and the detonator box is not less than 15m. 5. When extracting a single electric detonator from a bundle of electric detonators, do not pull the tube hard to smash the tube body, or pull the tube body hard to rub the foot line. The bundled electric detonator should be smoothed and the front end line should be pulled out. Pull the detonator out. After a single electric detonator is withdrawn, its foot line must be twisted into a short circuit. 6. When assembling the explosive charge, the following rules must be observed: A. It must be carried out near the blasting work site where the roof is well protected from electrical equipment and electrical conductors. It is strictly forbidden to sit on the blasting material box to assemble the explosive charge. B. Assembling the explosive charge should prevent the electric detonator from being subjected to vibration, impact, breaking the foot line and damaging the insulation of the foot line. C. The electric detonator must be installed at the top of the medicine roll. It is strictly forbidden to use electric detonators instead of bamboo and wooden sticks. The electric detonator must be fully inserted into the medicine roll. It is strictly forbidden to insert the electric detonator obliquely in the middle of the medicine roll or on the medicine roll. D. After the electric detonator is inserted into the medicine roll, the detonator must be entangled with the foot line, and the electric detonator line is twisted into a short circuit. 6. After blasting, after 30 minutes (at least 30 minutes), the guns are blown away. The gunners, tile inspectors and team leaders must first inspect the blasting site to check the ventilation and gas. Through fault safety technical measures In the 11907 contact lane, a fault was encountered during the excavation process, and the fault was produced at 177°∠41°. H = 2.2 m. In order to ensure the safe and smooth construction of the excavation during the fault, the following safety technical measures are specially formulated: Technical measures: Cross-fault construction method It is required to use a small cannon and a wind tunnel to dig a short branch and short excavation. It is required that each shot should not exceed 600 mm. The roof management is managed by the I-beam shed, which is used to break through the wedge. The wedge material is made of iron materials such as scrap bolts and brazing. The lanes help the steel legs to prevent the inverted shed device. If there is an empty gang, the lanes must be filled and compacted, and the plastic woven nets and struts are used for support. If the roof area of ​​the roadway is more than 1 square meter, the anchor should be placed within the empty roof area (the spacing between the anchors is 800mm*800mm). It is constructed by ordinary drilling and blasting method. The wind-driven anchor head or YT-28 wind drill is used for the eye. The millisecond delay electric detonator is charged in the forward direction, and the series is connected. The explosive used is a three-level coal mine permitting emulsion explosive, and each eye has a roll of water cannon mud. The length of the sealing mud is strictly in accordance with the regulations. The use of divided eye-catching, divided charge, detonation, the number of shots per time is no more than 10, the depth of the eye when the support is 800mm, the eye volume per eye does not exceed 0.2kg of explosives, the gutter The eye does not exceed 0.4kg and the auxiliary eye is between the two. The frame support cycle progress is 0.6m, the maximum control top distance is less than 0.8m, and the minimum control top distance is less than 0.2m. First, permanent support 1.19# Coal contact Shangshan roadway permanent support adopts anchor net beam support (special case adopts frame support), roadway net width × net height = 4.2 × 2.9m. The top is made of Ф20×2000mm high-strength anchors. Each anchor has 2 coils of resin anchoring agent. It is matched with Ф16×4000mm reinforced beams. The spacing between bolts is 800×800mm. It is matched with Ф15.24mm×6.3m anchor cable. Plate, 4 anchors of resin anchoring agent for each anchor cable, between anchor cables and rows, 1800mm×2000mm, arranged along the center of the roadway; the two roadway supports are strong anchors such as Ф20×2000mm, and each anchor is 2 rolls. Resin anchoring agent, the spacing between anchors is 800×800mm. The full section of the roadway is laid with a Ф4.0mm, meshed 50×50mm woven metal mesh, the compression is not less than 100mm, and connected by 12# wire, the connection spacing is not more than 200mm. 2. When the roof crushing pressure is large or the top-supporting coal is constructed, when the strength of the anchoring mesh cable cable is not up to the design requirements, the trapezoidal steel shed is used, the shed is 600mm, and the backing plate is 400mm. Specifications: length × width × thickness =800mm×70mm×40mm, 6m×1.2m plastic mesh is laid in full section, the pressure is not less than 100mm, and it is connected by 14# wire, the connection spacing is less than or equal to 200mm. After the installation, each steel shed will play 4 struts, and the slab specifications: length × width × thickness = 580mm × 70mm × 70mm. Second, temporary support (1) Temporary support form 1. During the construction process, no matter whether the roof rock is good or bad, temporary support must be used. The temporary support is supported by metal front beam. The front beam must use at least three intact Φ75mm seamless steel tubes with a length of 4.8m and a wall thickness of not less than 4.0mm. The back wood should be 1.6m long and the thickness should be no less than 50mm. Solid wood not less than 100mm; the lifting ring is bent into a circular diameter of Φ100mm by a steel plate with a thickness of 8mm, and the M20 nut is welded up. Each front beam must be suspended by two rings in a straight line (the line is parallel to the center line of the roadway). The spacing between the rings is the spacing of two adjacent rows of top anchors on a straight line. The maximum control top distance of the temporary beam temporary support is 1900mm, and the minimum control top distance is 300mm. It is strictly forbidden for personnel to work under the empty roof. Safety technical measures 1. Strictly implement the system of knocking and helping. Before starting work, the team leader must conduct a comprehensive inspection of the safety of the work surface and confirm that there is no danger before the authorized personnel enter the work surface. 2. Excavation work is strictly prohibited for empty top work. The support within 10m of the heading face must be reinforced before blasting. 3, must take the front to explore support. 4, 5, to shallow eye, more eye, less charge, put a small cannon, or hand rubbing method, try to avoid shaking the surrounding rock or cause a roof due to shooting. Support in time to minimize the exposure time of the top plate and reduce the exposed area. If the pressure increases, special support should be taken in time for the site. 7. In the construction process, it is necessary to adhere to the principle of “discovery and exploration, first exploration and then excavationâ€. 8. The underground personnel must be familiar with the water inrush: the pressure of the two groups is significantly increased, the bottom drum or cracks occur, water is generated, the lanes are covered with sweat and red, the water is increased, the air is cold, the mist is generated, the water color is mixed, and the water is mixed. There is a smell in the hair, and there is a hole in the drill and there is a stuck phenomenon. If the above water inrush is present, the cause should be immediately identified and reported to the dispatching room. If the situation is urgent, the personnel should be evacuated according to the disaster avoidance route. 9. Strict implementation of operating procedures, handover classes and safety inspection systems during construction. It is necessary to constantly observe the changes in the stability of the surrounding rock, and timely grasp the time when the faults, fracture zones, and lithologic abrupt zones are exposed. Once you find an abnormality, you should deal with it in time to prevent it from happening. 10. If the roof of the shot is difficult to control and manage, and there is a danger of falling roof, it should be changed by hand. 11. The underground electrical equipment should be placed in a place where the ventilation conditions are better and there is no water around; 12. Underground electrical equipment, cables and wires shall not be repaired and repaired; 13. Strictly implement the system of power transmission and stoppage. Power failure must be listed, and electricity and discharge should be carried out before work. Blasting management 1. Eye-catching: When drilling the hole, do not swing the drill pipe up and down to ensure the direction of drilling. Do not stand under the drill pipe to avoid hurting people. 2. Charge: (1) Apply high-pressure water or compressed air to clean the blasthole before charging, and then place the bottom mud. (2) When you are charging, you should use a hand-drawn foot line and gently push the medicine roll into the fundus with a wooden or bamboo gun stick in one hand, and apply even force to make the medicine rolls meet. After the medicine is packaged, the ends of the two legs should be kinked. (3) The application of water cannon mud and non-combustible, plastic clay for sealing mud, it is forbidden to use block materials for sealing mud. It is strictly forbidden to shoot the blasthole without sealing mud, insufficient sealing mud or not strict. (4) When loading the cannon mud, pull the mud with one hand and use the gun stick in one hand, and gently tamper it. 3, shooting warning (1), the evacuation distance of the gun: the detonation position must be set outside the 11907 lane, and the straight line distance is guaranteed to be 300m, the straight bend distance is 150m, and there is shelter cover. The length of the blasting busbar should meet the blasting requirements. (2) When blasting, it is necessary to stand at all the channels that can reach the blasting site with a straight line of 300m and a straight bend of 150m. The team leader should assign responsible personnel to stand guard, and warning signs, railings or drawstrings should be set at the warning line. (3) Before the blasting, the team leader must check the personnel situation and determine that there is no one in the working face and the warning line before issuing the detonation order. The blaster used the whistle as a warning number, and at least three whistle blows each time, each time between 5 and 10 seconds, and no problem can be detonated. 4, shooting (1) Before the shooting, the cables, wind pipes and other equipment in the front and rear lanes of the shooting can be covered, and the tools are moved to the safe place behind the working surface. (2) The gunners, the inspectors, the team leader must implement the “one gun and three inspection system†and the “three-person chain shot†system. (3) The shooting work must be carried out by full-time gunners and certified to work. All blasting personnel, including blasting, drug delivery, and charging personnel, must be familiar with the performance of the blasting materials and the provisions of this regulation. (4), the connection of the blasting busbar and the footline, and the inspection and blasting work of the blasting line. Only the gunners are allowed to operate by one person, and other personnel are strictly prohibited from engaging in this work. (5), eye-catching and charging should not be carried out at the same time. It is strictly forbidden to put a cannon and a cannon. (6) In case of one of the following circumstances, the drug is not allowed to be released: 1. When the gas concentration in the return airflow reaches 0.8% within 20m near the shooting location. 2. Within 20m of the shooting position, there will be uncleared coal gangue, when the mine car or other objects block the 1/3 section of the roadway. 3. When the working surface control top distance exceeds the specified time. 4. There is gas in the blasthole, and the temperature is high and low. 5. When the working face is insufficient. 5. Blasting requirements: 1. All blasting personnel, including the blasting personnel and the drug delivery and charging personnel must be familiar with the basic performance and use requirements of the blasting equipment and blasting materials; 2, eye-catching, charging, shooting, according to the blasthole layout and blasting instructions; 3. After the explosives are collected, they should be placed in the explosives box and locked. The middle of the explosives must not be stopped or transferred to others. The remaining explosives on duty must be returned to the explosives warehouse on duty; the electric detonators are only allowed to be placed in the explosive materials box, and they are carried. Lock, do not allow random, in case of loss. 4. Explosives and detonators must be stored separately in a special explosive material box and locked; the explosive material box must be placed in a place where the top plate is intact, the bracket is intact, and the machinery and electrical equipment are avoided. The blasting material box must be placed in a safe place outside the warning line during blasting. The distance between the explosive material box and the detonator box is not less than 15m. 5. When extracting a single electric detonator from a bundle of electric detonators, do not pull the tube hard to smash the tube body, or pull the tube body hard to rub the foot line. The bundled electric detonator should be smoothed and the front end line should be pulled out. Pull the detonator out. After a single electric detonator is withdrawn, its foot line must be twisted into a short circuit. 6. When assembling the explosive charge, the following rules must be observed: A. It must be carried out near the blasting work site where the roof is well protected from electrical equipment and electrical conductors. It is strictly forbidden to sit on the blasting material box to assemble the explosive charge. B. Assembling the explosive charge should prevent the electric detonator from being subjected to vibration, impact, breaking the foot line and damaging the insulation of the foot line. C. The electric detonator must be installed at the top of the medicine roll. It is strictly forbidden to use electric detonators instead of bamboo and wooden sticks. The electric detonator must be fully inserted into the medicine roll. It is strictly forbidden to insert the electric detonator obliquely in the middle of the medicine roll or on the medicine roll. D. After the electric detonator is inserted into the medicine roll, the detonator must be entangled with the foot line, and the electric detonator line is twisted into a short circuit. 6. After blasting, after 30 minutes (at least 30 minutes), the guns are blown away. The gunners, tile inspectors and team leaders must first inspect the blasting site to check the ventilation and gas. Through fault safety technical measures In the 11907 contact lane, a fault was encountered during the excavation process, and the fault was produced at 177°∠41°. H = 2.2 m. In order to ensure the safe and smooth construction of the excavation during the fault, the following safety technical measures are specially formulated: Technical measures: Cross-fault construction method It is required to use a small cannon and a wind tunnel to dig a short branch and short excavation. It is required that each shot should not exceed 600 mm. The roof management is managed by the I-beam shed, which is used to break through the wedge. The wedge material is made of iron materials such as scrap bolts and brazing. The lanes help the steel legs to prevent the inverted shed device. If there is an empty gang, the lanes must be filled and compacted, and the plastic woven nets and struts are used for support. If the roof area of ​​the roadway is more than 1 square meter, the anchor should be placed within the empty roof area (the spacing between the anchors is 800mm*800mm). It is constructed by ordinary drilling and blasting method. The wind-driven anchor head or YT-28 wind drill is used for the eye. The millisecond delay electric detonator is charged in the forward direction, and the series is connected. The explosive used is a three-level coal mine permitting emulsion explosive, and each eye has a roll of water cannon mud. The length of the sealing mud is strictly in accordance with the regulations. The use of divided eye-catching, divided charge, detonation, the number of shots per time is no more than 10, the depth of the eye when the support is 800mm, the eye volume per eye does not exceed 0.2kg of explosives, the gutter The eye does not exceed 0.4kg and the auxiliary eye is between the two. The frame support cycle progress is 0.6m, the maximum control top distance is less than 0.8m, and the minimum control top distance is less than 0.2m. First, permanent support 1.19# Coal contact Shangshan roadway permanent support adopts anchor net beam support (special case adopts frame support), roadway net width × net height = 4.2 × 2.9m. The top is made of Ф20×2000mm high-strength anchors. Each anchor has 2 coils of resin anchoring agent. It is matched with Ф16×4000mm reinforced beams. The spacing between bolts is 800×800mm. It is matched with Ф15.24mm×6.3m anchor cable. Plate, 4 anchors of resin anchoring agent for each anchor cable, between anchor cables and rows, 1800mm×2000mm, arranged along the center of the roadway; the two roadway supports are strong anchors such as Ф20×2000mm, and each anchor is 2 rolls. Resin anchoring agent, the spacing between anchors is 800×800mm. The full section of the roadway is laid with a Ф4.0mm, meshed 50×50mm woven metal mesh, the compression is not less than 100mm, and connected by 12# wire, the connection spacing is not more than 200mm. 2. When the roof crushing pressure is large or the top-supporting coal is constructed, when the strength of the anchoring mesh cable cable is not up to the design requirements, the trapezoidal steel shed is used, the shed is 600mm, and the backing plate is 400mm. Specifications: length × width × thickness =800mm×70mm×40mm, 6m×1.2m plastic mesh is laid in full section, the pressure is not less than 100mm, and it is connected by 14# wire, the connection spacing is less than or equal to 200mm. After the installation, each steel shed will play 4 struts, and the slab specifications: length × width × thickness = 580mm × 70mm × 70mm. Second, temporary support (1) Temporary support form 1. During the construction process, no matter whether the roof rock is good or bad, temporary support must be used. The temporary support is supported by metal front beam. The front beam must use at least three intact Φ75mm seamless steel tubes with a length of 4.8m and a wall thickness of not less than 4.0mm. The back wood should be 1.6m long and the thickness should be no less than 50mm. Solid wood not less than 100mm; the lifting ring is bent into a circular diameter of Φ100mm by a steel plate with a thickness of 8mm, and the M20 nut is welded up. Each front beam must be suspended by two rings in a straight line (the line is parallel to the center line of the roadway). The spacing between the rings is the spacing of two adjacent rows of top anchors on a straight line. The maximum control top distance of the temporary beam temporary support is 1900mm, and the minimum control top distance is 300mm. It is strictly forbidden for personnel to work under the empty roof. Safety technical measures 1. Strictly implement the system of knocking and helping. Before starting work, the team leader must conduct a comprehensive inspection of the safety of the work surface and confirm that there is no danger before the authorized personnel enter the work surface. 2. Excavation work is strictly prohibited for empty top work. The support within 10m of the heading face must be reinforced before blasting. 3, must take the front to explore support. 4, 5, to shallow eye, more eye, less charge, put a small cannon, or hand rubbing method, try to avoid shaking the surrounding rock or cause a roof due to shooting. Support in time to minimize the exposure time of the top plate and reduce the exposed area. If the pressure increases, special support should be taken in time for the site. 7. In the construction process, it is necessary to adhere to the principle of “discovery and exploration, first exploration and then excavationâ€. 8. The underground personnel must be familiar with the water inrush: the pressure of the two groups is significantly increased, the bottom drum or cracks occur, water is generated, the lanes are covered with sweat and red, the water is increased, the air is cold, the mist is generated, the water color is mixed, and the water is mixed. There is a smell in the hair, and there is a hole in the drill and there is a stuck phenomenon. If the above water inrush is present, the cause should be immediately identified and reported to the dispatching room. If the situation is urgent, the personnel should be evacuated according to the disaster avoidance route. 9. Strict implementation of operating procedures, handover classes and safety inspection systems during construction. It is necessary to constantly observe the changes in the stability of the surrounding rock, and timely grasp the time when the faults, fracture zones, and lithologic abrupt zones are exposed. Once you find an abnormality, you should deal with it in time to prevent it from happening. 10ã€å¦‚果放炮ä¸é¡¶æ¿éš¾ä»¥æŽ§åˆ¶ä¸Žç®¡ç†ã€æœ‰å†’顶的å±é™©ï¼Œåº”改用手é•æ–¹æ³•æŽ˜è¿›ã€‚ 11ã€äº•ä¸‹ç”µæ°”设备应安放在通风æ¡ä»¶æ¯”较好,周围没有淋水的地方; 12ã€äº•ä¸‹ä¸å¾—带电检修ã€æ¬è¿ç”µæ°”设备ã€ç”µç¼†å’Œç”µçº¿; 13ã€ä¸¥æ ¼æ‰§è¡Œåœé€ç”µåˆ¶åº¦ï¼Œåœç”µå¿…须挂牌,工作å‰è¿›è¡ŒéªŒç”µã€æ”¾ç”µï¼Œä¸¥ç¦å¸¦ç”µä½œä¸šã€‚ çˆ†ç ´ç®¡ç† 1ã€æ‰“眼:钻眼时,钻æ†ä¸è¦ä¸Šä¸‹å·¦å³æ‘†ï¼Œä»¥ä¿è¯é’»è¿›æ–¹å‘,钻æ†ä¸‹æ–¹ä¸è¦ç«™äººï¼Œä»¥å…è½ä¸‹ä¼¤äººã€‚ 2ã€è£…è¯ï¼š (1)ã€è£…è¯å‰åº”用高压水或压缩空气对炮眼进行清å”工作,然åŽåº§åº•æ³¥ã€‚ (2)ã€è£…è¯æ—¶è¦ä¸€æ‰‹æ‹‰è„šçº¿ï¼Œä¸€æ‰‹æ‹¿æœ¨åˆ¶æˆ–竹制炮æ£å°†è¯å·è½»è½»æŽ¨å…¥çœ¼åº•ï¼Œç”¨åŠ›å‡åŒ€ï¼Œä½¿è¯å·ç›¸æŽ¥ã€‚è¯åŒ…装完åŽè¦å°†ä¸¤è„šçº¿æœ«ç«¯æ‰ç»“。 (3)å°æ³¥åº”用水炮泥以åŠä¸ç‡ƒæ€§çš„,å¯å¡‘性粘土,ç¦æ¢ä½¿ç”¨å—状ææ–™åšå°æ³¥ã€‚æ— å°æ³¥ã€å°æ³¥ä¸è¶³æˆ–ä¸ä¸¥çš„炮眼严ç¦æ”¾ç‚®ã€‚ (4)ã€è£…填炮泥时,一手拉脚线,一手拿炮æ£æŽ¨å¡«ç‚®æ³¥ï¼Œç”¨åŠ›è½»è½»æ£å®žã€‚ 3ã€æ”¾ç‚®è¦æˆ’ (1)ã€æ”¾ç‚®æ’¤äººè·ç¦»ï¼šèµ·çˆ†ä½ç½®å¿…须设在11907è”巷外,且ä¿è¯ç›´çº¿è·ç¦»300m, æ‹ç›´å¼¯è·ç¦»150mï¼Œå¹¶æœ‰æŽ©ä½“æŽ©æŠ¤ï¼Œçˆ†ç ´æ¯çº¿é•¿åº¦åº”符åˆçˆ†ç ´è¦æ±‚。 (2)ã€çˆ†ç ´æ—¶ï¼Œè¦åœ¨æ‰€æœ‰èƒ½é€šå¾€çˆ†ç ´åœ°ç‚¹ç›´çº¿300m,æ‹ç›´å¼¯150mçš„å„通é“处站岗。ç组长è¦å§”派责任心强的人员站岗,è¦æˆ’线处应设置è¦æˆ’牌ã€æ æ†æˆ–拉绳。 (3)ã€çˆ†ç ´å‰ï¼Œç组长必须清点人员情况,确定工作é¢åŠè¦æˆ’çº¿å†…æ— äººæ—¶ï¼Œæ–¹å¯ä¸‹è¾¾èµ·çˆ†å‘½ä»¤ã€‚çˆ†ç ´å·¥ä»¥å¹å£å“¨ä¸ºè¦æˆ’å·ï¼Œæ¯æ¬¡è‡³å°‘è¦å¹3次å£å“¨ï¼Œæ¯æ¬¡é—´éš”5—10ç§’ï¼Œæ— é—®é¢˜æ–¹å¯èµ·çˆ†ã€‚ 4ã€æ”¾ç‚® (1)ã€æ”¾ç‚®å‰è¦æŠŠæ”¾ç‚®å¤„å‰åŽå··é“内的电缆ã€é£Žæ°´ç®¡ç‰è®¾å¤‡æŽ©ç›–好,工具移放到工作é¢åŽå®‰å…¨åœ°ç‚¹å†…。 (2)ã€æ”¾ç‚®å‘˜ã€ç“¦æ£€å‘˜ã€ç组长必须执行“一炮三检制â€åŠâ€œä¸‰äººè¿žé”放炮â€åˆ¶åº¦ã€‚ (3)ã€æ”¾ç‚®å·¥ä½œå¿…须由专èŒæ”¾ç‚®å‘˜æ‹…任,并æŒè¯ä¸Šå²—ï¼Œæ‰€æœ‰çˆ†ç ´äººå‘˜åŒ…æ‹¬çˆ†ç ´ã€é€è¯ã€è£…è¯äººå‘˜ï¼Œå¿…é¡»ç†Ÿæ‚‰çˆ†ç ´æ料性能和本规程规定。 (4)ã€çˆ†ç ´æ¯çº¿å’Œè„šçº¿çš„连接以åŠçˆ†ç ´çº¿è·¯çš„æ£€æŸ¥ä¸Žçˆ†ç ´å·¥ä½œï¼Œåªå‡†æ”¾ç‚®å‘˜ä¸€äººæ“作,其它人员严ç¦ä»Žäº‹æ¤é¡¹å·¥ä½œã€‚ (5)ã€æ‰“眼和装è¯ä¸å¾—åŒæ—¶è¿›è¡Œï¼Œä¸¥ç¦æ”¾ç³Šç‚®åŠæ˜Žç‚®ã€‚ (6)ã€æœ‰ä¸‹åˆ—情况之一的ä¸å‡†è£…è¯æ”¾ç‚®ï¼š â‘ ã€æ”¾ç‚®åœ°ç‚¹é™„è¿‘20m内回风æµä¸ç“¦æ–¯æµ“度达到0.8%时。 â‘¡ã€æ”¾ç‚®åœ°ç‚¹20må†…ï¼Œæœ‰æœªæ¸…é™¤çš„ç…¤çŸ¸ï¼ŒçŸ¿è½¦æˆ–å…¶å®ƒç‰©ä½“å µå¡žå··é“1/3æ–é¢ä»¥ä¸Šæ—¶ã€‚ â‘¢ã€å·¥ä½œé¢æŽ§é¡¶è·è¶…过规定时。 â‘£ã€ç‚®çœ¼å†…有瓦斯涌出,温度忽高忽低时。 ⑤ã€å·¥ä½œé¢é£Žé‡ä¸è¶³æ—¶ã€‚ 5ã€çˆ†ç ´è¦æ±‚: â‘ ã€æ‰€æœ‰çˆ†ç ´äººå‘˜ï¼ŒåŒ…括放炮员åŠé€è¯ã€è£…è¯äººå‘˜å¿…é¡»ç†Ÿæ‚‰çˆ†ç ´å™¨æå’Œçˆ†ç ´æ料基本性能和使用è¦æ±‚; â‘¡ã€æ‰“眼ã€è£…è¯ã€æ”¾ç‚®è¦æŒ‰ç…§ç‚®çœ¼å¸ƒç½®å›¾åŠçˆ†ç ´è¯´æ˜Žä¹¦è¿›è¡Œ; â‘¢ã€ç‚¸è¯é¢†å–åŽï¼Œåº”放到炸è¯ç®±å†…ï¼Œå¹¶åŠ é”,ä¸é—´ä¸å¾—åœç•™æˆ–转交他人,当ç剩余炸è¯å¿…须当ç退回炸è¯åº“;电雷管åªå‡†æ”¾ç‚®å‘˜æ”¾åœ¨çˆ†ç ´æ料箱内éšèº«æºå¸¦ï¼Œå¹¶åŠ é”,ä¸å‡†éšä¾¿ä¹±æ”¾ï¼Œä»¥é˜²ä¸¢å¤±ã€‚ â‘£ã€ç‚¸è¯å’Œé›·ç®¡å¿…须分开å˜æ”¾åœ¨ä¸“用的爆炸ææ–™ç®±å†…ï¼Œå¹¶åŠ é”;çˆ†ç ´æ料箱必须放在顶æ¿å®Œå¥½ã€æ”¯æž¶å®Œæ•´ï¼Œé¿å¼€æœºæ¢°ã€ç”µæ°”è®¾å¤‡çš„åœ°ç‚¹ã€‚çˆ†ç ´æ—¶å¿…é¡»æŠŠçˆ†ç ´æ料箱放到è¦æˆ’线以外的安全地点。爆炸æ料箱与雷管箱间è·ä¸å°äºŽ15m。 ⑤ã€ä»ŽæˆæŸçš„电雷管ä¸æŠ½å–å•ä¸ªç”µé›·ç®¡æ—¶ï¼Œä¸å¾—手拉脚线硬拽管体,也ä¸å¾—手拉管体硬拽脚线,应将æˆæŸçš„电雷管顺好,拉出å‰ç«¯è„šçº¿å°†é›·ç®¡æŠ½å‡ºã€‚抽出å•ä¸ªç”µé›·ç®¡åŽï¼Œå¿…须将其脚线æ‰ç»“æˆçŸè·¯ã€‚ â‘¥ã€è£…é…起爆è¯å·æ—¶ï¼Œå¿…é¡»éµå®ˆä¸‹åˆ—规定: Aã€å¿…须在顶æ¿å®Œå¥½é¿å¼€ç”µæ°”è®¾å¤‡å’Œå¯¼ç”µä½“çš„çˆ†ç ´å·¥ä½œåœ°ç‚¹é™„è¿‘è¿›è¡Œã€‚ä¸¥ç¦ååœ¨çˆ†ç ´æ料箱上装é…起爆è¯å·ã€‚ Bã€è£…é…起爆è¯å·åº”防æ¢ç”µé›·ç®¡å—震动ã€å†²å‡»ï¼ŒæŠ˜æ–脚线和æŸå脚线ç»ç¼˜å±‚。 Cã€ç”µé›·ç®¡å¿…须由è¯å·çš„顶部装入,严ç¦ç”¨ç”µé›·ç®¡ä»£æ›¿ç«¹ã€æœ¨æ£æ‰Žçœ¼ã€‚电雷管必须全部æ’å…¥è¯å·å†…。严ç¦å°†ç”µé›·ç®¡æ–œæ’在è¯å·çš„ä¸éƒ¨æˆ–æ†åœ¨è¯å·ä¸Šã€‚ Dã€ç”µé›·ç®¡æ’å…¥è¯å·åŽï¼Œå¿…é¡»ç”¨è„šçº¿å°†é›·ç®¡ç¼ ä½ï¼Œå¹¶å°†ç”µé›·ç®¡è„šçº¿æ‰ç»“æˆçŸè·¯ã€‚ 6ã€çˆ†ç ´åŽï¼Œå¾…30分钟åŽ(至少30分钟)工作é¢ç‚®çƒŸå¹æ•£ï¼Œæ”¾ç‚®å‘˜ã€ç“¦æ£€å‘˜å’Œçç»„é•¿å¿…é¡»é¦–å…ˆå·¡è§†çˆ†ç ´åœ°ç‚¹ï¼Œæ£€æŸ¥é€šé£Žã€ç“¦æ–¯ã€é¡¶æ¿ã€æ‹’爆ã€æ®‹çˆ†ç‰æƒ…况。如有å±é™©æƒ…况,应立å³å¤„ç†ã€‚ 7ã€é€šç”µä»¥åŽæ‹’çˆ†æ—¶ï¼Œçˆ†ç ´å·¥å¿…é¡»å…ˆå–ä¸‹æŠŠæ‰‹æˆ–é’¥åŒ™ï¼Œå¹¶å°†çˆ†ç ´æ¯çº¿ä»Žç”µæºä¸Šæ‘˜ä¸‹ï¼Œæ‰ç»“æˆçŸè·¯ï¼Œå†ç‰ä¸€å®šæ—¶é—´(使用瞬å‘电雷管时,至少ç‰5分钟;使用毫秒延期电雷管时,至少ç‰15分钟),æ‰å¯æ²¿çº¿è·¯æ£€æŸ¥ï¼Œæ‰¾å‡ºæ‹’çˆ†çš„åŽŸå› ã€‚ 8ã€å¤„ç†æ‹’爆ã€æ®‹çˆ†æ—¶ï¼Œå¿…须在当çç组长指导下进行,并应在当ç处ç†å®Œæ¯•ã€‚如果当ç未能处ç†å®Œæ¯•ï¼Œå½“ççˆ†ç ´å·¥å¿…é¡»åœ¨çŽ°åœºå‘下一ççˆ†ç ´å·¥äº¤æŽ¥æ¸…æ¥šã€‚ 处ç†æ‹’爆时,必须éµå®ˆä¸‹åˆ—规定: ①由于连线ä¸è‰¯é€ æˆçš„拒爆,å¯é‡æ–°è¿žçº¿èµ·çˆ†ã€‚ ②在拒爆炮眼0.3m以外å¦æ‰“与拒爆炮眼平行的新炮眼,é‡æ–°è£…è¯èµ·çˆ†ã€‚ ③严ç¦ç”¨é•åˆ¨æˆ–从炮眼ä¸å–出原放置的起爆è¯å·æˆ–从起爆è¯å·ä¸æ‹‰å‡ºç”µé›·ç®¡ã€‚ä¸è®ºæœ‰æ— 残余炸è¯ä¸¥ç¦å°†ç‚®çœ¼æ®‹åº•ç»§ç»åŠ æ·±;严ç¦ç”¨æ‰“眼的方法往外æŽè¯;严ç¦ç”¨åŽ‹é£Žå¹æ‹’爆(残爆)炮眼。 ④处ç†æ‹’爆的炮眼爆炸åŽï¼Œçˆ†ç ´å·¥å¿…须详细检查炸è½çš„ç…¤ã€çŸ¸ï¼Œæ”¶é›†æœªçˆ†çš„电雷管。 ⑤在拒爆处ç†å®Œæ¯•ä»¥å‰ï¼Œä¸¥ç¦åœ¨è¯¥åœ°ç‚¹è¿›è¡Œä¸Žå¤„ç†æ‹’çˆ†æ— å…³çš„å·¥ä½œã€‚ 9ã€æ‰“çœ¼æ—¶æ ¹æ®ç…¤å±‚或岩层具体情况,对炮眼间è·ã€ç‚®çœ¼æ·±åº¦åŠè£…è¯é‡è¿›è¡Œé€‚当调整。装è¯æ—¶ä¸¥ç¦è£…åž«è¯æˆ–ç›–è¯ã€‚ 附放炮è¦æˆ’图与é¿ç¾è·¯çº¿å›¾
Goodsense Self-Propelled Conveyor Belt Loader advantages:
The BLB88 Self-propelled Conveyor Belt Loader is a perfect solution for handling all types of aircraft as reasonably and beautifully designed ground support equipment.
Product Highlights:
Wide lifting range and strong carrying capacity.
Simple structure, high technical, reliable quality.
The advanced technology ensures the high efficiency strong power, automatic transmission, strong stability, and easy operation.
Equipped with emergency evacuation hand pump.
General
Model
BLB88
Power Type
Electric
Max Transmission Unit
kg
350
Max Transmission Capacity
kg
1200
Overall Length
mm
8000
Overall Width
mm
2120
Height
mm
1500
Wheelbase
mm
3000
Travel Speed (No Load)
km/h
28
Wheel Thread (F/R)
mm
1710/1695
Transfer Length
mm
7650
Transfer Width
mm
870
Transmission Speed
mm/s
160-500
Transfer Extended Height (F/R)
mm
4100/1260
Transfer Lowered Height (F/R)
mm
1180/880
Application Area:
1.Airport
If you have any other questions,please contact us directly.Our forklift are all with high quality,and you can choose any other engine to equip.It can be produced according to your idea.And we invite you to visit our factory.
Self-propelled Conveyor Belt Loader Self-Propelled Conveyor Belt Loader,Portable Transmission Loader,Conveyor Belt Loader,Flat Belt Converyor ZHEJIANG GOODSENSE FORKLIFT CO.,LTD , https://www.dieselforklift.nl
Safety technical measures for crossing roadway in coal mine roadway
Through fault safety technical measures