"If you stop for a day, the loss is estimated to be more than 10,000 yuan." Lao Zhou is a villager in the village of Yuhang, Hangzhou. He has three "four-joint" tea makers in his own home - that is, four electric tea makers. Spelling a streamline, coupled with a separate tea maker and recently purchased tea-making machine, the use of excessive electric power led to the failure of the meter, which became a matter of concern for Lao Zhou.
Someone may not clear that it would change the time, resulting in poor engine performance even damage to valves, if the teeth on the belt jump over the teeth of gear. So that`s why Tensioner Bearing exists. It keeps belt tension never be too low or too high.
The tensioner Bearing should be replaced when replacing the timing belt. And we are professional for the United States, Europe, Japan and other countries, to provide high quality and affordable tension bearing.
belt Idler Pulleys are provided with a series of radial reinforcing ribs to prevent deformation caused by the wedging action of the belt.
The Timing Belt Tensioner is used to keep tension on the timing belt. The timing belt is a rubber belt that runs over and through a series of pulleys and gears. Over time, due to age and heat, the belt will stretch out. As the belt stretches it can become loose, so the tensioner needs to adjust the belt as needed to keep it tight.
Tensioner Bearing Tensioner Bearing,High Strength Tensioner Bearing,Tensioner Roller Bearing,Belt Idler Pulley,Timing Belt Tensioner NINGBO DGOFEN AUTO TRADE CO., LTD , http://www.dgofen.com
After implementing a household table, each meter has a series of independent numbers, corresponding to one household. Therefore, when the meter fails to replace the new meter, a manual registration process is required. For those farmers who are far away, it usually takes 1 to 3 days.
To this end, Yuhang Electric Power staff developed the "emergency rescue measurement turnover box." A few days ago, the transportation inspection staff of the Yuhang Power Supply Station, which was formally equipped with this emergency box, arrived at Shuanglian Village and replaced the new meter for the tea farmer Lao Zhou. From repairing the phone to the fault and completing the replacement, the work that was completed in the previous days can be completed in less than an hour. Because the emergency box is equipped with a PDA handheld - the handheld scans the barcodes of the old meter and the new meter and can be automatically connected to the power system to complete the replacement binding of the new meter.