Members of the Standing Committee of the Luoyang Municipal Party Committee and members of the Party Committee of the Municipal Government Wang Yujun and Liu Feixiang, Chairman of China Railway Construction Heavy Industry, jointly unveiled the joint venture company. Chairman of the company Yu Zhangfa, member of the Standing Committee of the Luoyang Municipal Party Committee and member of the Party Group of the Municipal Government Wang Feijun, Liu Feixiang, Chairman of Tiejian Heavy Industry, and Ma Chaoxin, Chairman of Luoyang Rail Transit jointly unveiled the opening ceremony of the first shield machine Peony. The establishment of CITIC Tiejian Heavy Industry Digging Equipment Co., Ltd. and the offline production of the first shield machine can not only fill the gaps in high-end equipment for rail transportation in Luoyang, but also quickly occupy the highest point of rail transportation high-end equipment technology. It can also stimulate industrial agglomeration and help CITIC Heavy Industries. Industry cultivation and reform, innovation and development. At the unveiling ceremony, the general manager of the company, Wang Chunmin, said that the “13th Five-Year Plan†was an important period for the development of China’s infrastructure construction. CITIC Heavy Industries proposed the development of the tunnelling equipment industry at an appropriate time, and took the Luoyang Metro project as an opportunity to build a railway station with heavy railroads and Luoyang Railway. Transport cooperation, the introduction of tunneling equipment industry, the establishment of CITIC Railway Construction Heavy Machinery Co., Ltd. This also marks the development of the tunneling equipment industry in Luoyang City will be moving toward a new stage. At the same time, the offline of the first shield machine of Luoyang Metro will promote the Luoyang Metro project to enter the project construction stage as soon as possible, and will also help the city to realize “Luoyang Metro Luoyang Construction†as soon as possible. Liu Jianxiang, Chairman of China Railway Construction Heavy Industry Co., Ltd., said that Tie Jianzhong’s work is the most comprehensive and competitive modern rail transit project high-end equipment manufacturer and solution provider and provider of overall project construction plans. It will provide joint ventures with powerful and necessary Technical support, together with the strength of CITIC Heavy Industry and Luoyang rail transit, complement each other, form a group army with superior combat effectiveness, actively seize the commanding heights of the excavation market, and on the basis of “Luoyang Metro Luoyang Constructionâ€, The excavation equipment is sold overseas, and makes its due contribution to the high-end equipment manufacturing industry in Luoyang. Ma Chaoxin, chairman of Luoyang Rail Transit, said that according to the municipal government's plan, in June and November of this year, Metro Lines 1 and 2 will all be started one after another, and Luoyang Metro construction will enter a substantive construction stage. Luoyang Rail Transit Co., Ltd. will promote the use of the shield machine used by the joint venture in accordance with the work plan of the Luoyang Metro Luoyang Construction of the Provincial Party Committee, the provincial government and the municipal government to fully support the joint venture to become bigger and stronger and achieve win-win development. Wang Yujun, a member of the Standing Committee of the Luoyang Municipal Party Committee and a member of the municipal government party group, said that the establishment of the joint venture company and the release of the “Peony†symbolized another significant step forward in the innovation and development of CITIC Heavy Industry, and also marked the key equipment of Luoyang Metro. "Luoyang made" the initial realization of the vision. The construction of Luoyang Metro is a milestone in Luoyang's urban infrastructure construction in recent years. It is hoped that the joint venture company will give full play to its advantages in talents, technologies, brands, and markets, and develop first-class excavation equipment to inject new vitality into the manufacturing of Luoyang and the socio-economic development of the city. At the unveiling ceremony, the “Peony†shield machine, which was officially offline, was 6.4 meters in diameter. The total length of the machine was about 85 meters, and the total weight was about 450 tons. The horizontal turning radius reached 250 meters, and the overall performance reached the domestic advanced level. Applied to the excavation construction of Luoyang Metro Line 1. It is reported that in recent years, CITIC Heavy Industries has actively pursued the “Made in China 2025†strategy, insisted on innovation-driven, and leveraged on its own high-end equipment manufacturing R&D capabilities, it also possesses certain technology precipitation and manufacturing capabilities in tunneling equipment. The first Φ5m hard rock boring machine independently developed by CITIC Heavy Industries in 2013 has been successfully applied to the 1# tunnel digging project of the Guxian Reservoir Water Diversion Project in Luoyang City. The accumulated length of the tunnel has reached 6472 meters, and is expected to reach the total length by the end of June. 6640 meters of tunnel. The world-class engineering project undertaken by CITIC Heavy Industries Co., Ltd. Suite Pass Φ15.03m Shield machine is part of the conversion design and manufacturing work. The first batch of components was sent to Zhengzhou China Railway Equipment to enter the factory assembly stage in mid-April. Completed by the end of June. (This article comes from CITIC Heavy Industries) Heavy Gantry CNC Cutting Machine
Optional Features:
Parameters
Type
BLDH-Z-4080
BLDH-Z-5080
BLDH-Z-60100
BLDH-Z-80100
Input power
AC380V/50Hz;AC220V/50Hz
Track gauge(mm)
4035
5000
6000
8000
Machine width(mm)
4300
5500
6500
8500
Effective cutting width(mm)
3300
4300
5300
7300
Track length(mm)
8000
8000
10000
10000
Lift(mm)
200
Cutting thickness(mm)
Flame cutting: 5~200Plasma cutting: 1~30(According to the power supply size)
Cutting speed (mm/min)
Flame cutting:100~1000
Plasma
cutting: 450~5000
Idle speed(mm/min)
0~8000
Drive mode
Bilateral drive
System
Shanghai Jiaoda or Beijing Starfire
Operating accurancy
±0.5mm
Cutting
samples
Customer
cases
Automated Plasma Cutter,Heavy Plasma Cutting Machine,Heavy Cnc Cutting Machine,Gantry Flame Plasma Cnc Cutting Machine Shandong Buluoer Intelligent Technology Co., Ltd. , https://www.buluoercuttingmachines.com
CITIC Tiejian Heavy Industry Digging Equipment Co., Ltd. officially unveiled and established
the opening ceremony
"Peonies" unveiled the ribbon cutting
Peony Shield
The first shield machine “Peony†was officially offline in Luoyang Metro construction
CITIC Tiejian Heavy Industry Digging Equipment Co., Ltd. officially unveiled and established
On the morning of June 16th, in the Yibin high-end manufacturing industrial park of CITIC Heavy Industry Co., Ltd., CITIC Tiejian Heavy Industry Machinery Co., Ltd., a joint venture established by CITIC Heavy Industry, China Railway Construction Heavy Industry Group Co., Ltd. and Luoyang Rail Transit Co., Ltd., was officially unveiled. Established. At the same time, the first shield machine “Peony†in Luoyang Metro officially went offline.
Related News: Railway Construction CITIC Shield Machine