Wall-hung boiler energy-saving tips

1, when using hot water, it is not appropriate to open the hot tap to the maximum temperature. The wall-hung boiler starts to heat the water for a certain period of time. Even if the hot water tap is turned to the maximum, there will not be hot water flowing out. This will waste some cold water. It should be turned on first and then slowly enlarged, so that it can save energy Water, and the warming of water will be faster.

2. When using hot water for a long time, the number of hot water taps should be minimized. Because every time the hot water faucet is turned on and off, the boiler will need to be restarted. When the water starts, the water will slowly heat up. This wastes time and increases the workload of the boiler.

3. Turn off or turn down radiator valves in unoccupied rooms. If your housing area is large, there are many rooms, and the population is relatively small, then the radiator valve of a room that is not occupied or that is used infrequently can be completely turned off or turned down. This is equivalent to reducing the heating area and not only saving energy. In addition, the rise in temperature during normal use of space heating will also increase, reducing gas consumption.

4. When there is no person in the house during the daytime, it is not advisable to turn off the boiler immediately when walking. If the boiler is turned off immediately, the wall-hung boiler is set to high-grade for quick heating after off duty, which is equal to starting from the beginning. Before the boiler set temperature reaches the room temperature, the boiler needs time to run intensively, thus increasing the gas consumption. It is not environmentally friendly and energy-saving. It also increases the time for households to freeze.

5. When the family is not inhabited for a long time, the water in the boiler and the radiator should be drained. This saves you from wasting gas, not to mention that the boiler or radiator is frozen or leaking.

Sand Casting

Sand Casting



Equipment

0.75 Ton Intermediate Frequency Melting Furnace, Automatic Moulding Line, Clay Sand Conditioning Line, Crane, Electric Welding Machine, Crawler Shot Blasting Machine, Air Reservoir, Screw Air Compressor, Electric Spark Bead Welding Repairing Machine, AC Arc Welding Machine, Automatic Pouring Machine, Sand Mixer, Hot Core Equipment, Cold Core Euipment

Material & Standard

Carbon Iron, Ductile Iron, Steel Alloys, etc.

ASTM, AISI, GB, DIN, JIS, SAE, UNS, EN, JP

Application

Automotive Industry, Construction Machinery, Mining Machinery, Agricultural Machinery, Marine, etc.

Capability

Weight

0.5-40 kg(1.1-88 lbs)

Roughness

Ra25

Casting Tolerance

CT10-CT12

Wall Thickness

5 mm(0.25") Min

Secondary Operations:

CNC Machining, Milling, Turning, Threading, Drilling, Rolling, Wire Cutting, High Precision Grinding, Re-Shape, Sand Blaster, etc.

Surface: As-cast, Painting, Plating, Black Electro-Phoresis, Dacro Coating, Polishing, etc.

Sand Casting,Sand Casting Parts,Iron Sand Casting Parts,Sand Casting Steel Alloy Parts

J.B MACHINERY (NINGBO) CO., LTD. , https://www.jbcastings.com