Roof sheet roll forming machines/ Roof Sheet Forming Machine are widely used for building, include Corrugated Roof Sheet Roll Forming Machine,IBR Roof Sheet Roll Forming Machine, glazed tile roof sheet roll forming machine, Ridge Cap Tile Roll Forming Machine and Double Layer Roll Forming Machine.
These machines are high quality, save power heavy duty and low cost, which are easy to operate.
Specification:
Ps:The above are for reference, we design machines according to your needs.
Working process:
Decoiler- Feeding width- Roll forming machine- PLC control- Hydraulic cutting- Collecting platform
Pictures for machine:
Training and Installation : Roof Sheet Roll Forming Machine Roof Sheet Roll Forming Machine,Corrugated Roof Sheet Machine,Roof Tile Making Machine,Wave Panel Roll Forming Machine YingYee Machinery and Technology Service Co.,Ltd , https://www.yingyee.cn
Raw material
GI, PPGI, Aluminum coils
Material thickness range
0.3-0.8mm
Feeding width
1000mm, 1200mm, 1220mm, 1250mm
Forming speed
25-30m/min(excluding cutting time)
Rollers
18 rows
Material of rollers
45# steel with chromed
Shaft diameter and material
70mm, material is 40Cr
Material of cutting blade
Cr12 mould steel with quenched reatment
Control system
Mitsubishi/Siemens PLC control system with transducer inside
Main motor power
3KW
Hydraulic station power
3KW
Voltage
As your request
1. We offer installation service local in paid, reasonable charge.
2. QT test is welcome and professional.
3. manual and using guide is optional if no visiting and no installation.
Certification and after service:
1. Match the technology standard, ISO producing certification
2. CE certification
3. 12 months warranty since the delivery. Board.
Our advantages:
1. Short delivery period.
2. Effective communication
3. Interface customized.
Operational regulations for safe production of tailings pond return pump
1. Before starting the pump, check whether the lubrication of each part is good, whether the screw is loose, the belt is tight, whether there is any debris in the pump pool, whether the pipeline is unblocked, whether the disc is light, whether there is friction and impact sound in the pump, and Is the belt cover tightly fastened?
2. Before the pump is started, check the water seal packing condition and find that the water leakage should adjust the buckle or replace the packing.
3. Do not use wet hands when starting, apply one-hand side operation.
4. After the pump is started, the amount of added water should be adjusted reasonably according to the liquid level to ensure the liquid level is stable and prevent the pump from breathing.
5. Always check the motor, bearing temperature and lubrication of each part during operation. Do not touch the rotating part, and do not remove the safety device at will.
6. Use the return water pump strictly according to the operating procedures, and regularly replenish the return water, not only to ensure the process water, but also to prevent the return pool from overflowing.
7, parking in winter, no water in the pump and pipeline to avoid freezing.
8. When the temporary power failure or accident parking, immediately pull down the start switch and close the sewage discharge valve.