1. Under the direct leadership of the squad leader, carefully complete the grinding and grading process operations in accordance with the safety technical operating procedures and various rules and regulations.
SNOWKEY rake type Automatic Ice Storage capacity is from 18 ton to 200ton. Ice storage is placed in the 20` or 40` container and factory preassembled combined type ice storage is easy to move by truck, railway and ship.
Features
• Specially designed double insulation layer. Even when the ice storage is full, an air circulation layer would surround the ice. The ice will be kept at -5~-8℃, and dry.
• All components are strictly selected, ensuring the equipment continuous running, longer life.
• Patented structure design chainwheel and high strength link chains ensure stable running and not liable to be frozen and chain jamming;
• The elevating mechanism will adjust the ice raker height automatically and make sure the ice raker is always above the ice surface;
• Galvanized steel and stainless steel are for customer`s option depending on different situation.
• When delivering ice, the door will open automatically. People outside can see the ice situation through the window.
• Industrial PLC and touch operation panel for the control system, including monitoring system, stepless speed control for the ice raking system and alarm system.
Rake Type Automatic Ice Storage Ice Storage Box,Movable Ice Storage,Automatic Ice Storage,Large Ice Storage Fujian Snowman Trade Co., Ltd. , https://www.sinoicemachine.com
2. Familiar with the connection between the upper and lower operations, and create good technical conditions for the next operation.
3. Inspect the operation of the equipment and the operating status of the lubrication parts in time according to the system, find the problems in time, and fill in the records.
4. Do a good job in the safe and civilized production of this post. It is strictly forbidden to “run, run, drip, leak†and recover scattered ore in time.
5. Complete the production plan indicators of this post, control the mineral volume and cyclone overflow concentration and fineness indicators to achieve balanced production.
6. Check the change of the ore supply, the ore size and the ore properties of the ball mill , adjust the operating conditions in time, and regularly add the steel balls according to the technical card regulations, and replace the cyclone nozzles.
7. Check the working condition of high-frequency fine screen in time, clean the screen surface debris in time, and replace the damaged screen.
8. Strictly abide by the various rules and regulations of the factory and conscientiously implement the handover system.